SR.NOCLIENTPROJECTEND CLIENTSCOPE OF WORKYEAR
1SELPREPARATION OF TENTATIVE BOQ INCLUDE SKID BOQ, PIPING BOQ, SKID GAReliance Industries LtdSKID GA, SKID BOQ, PIPING BOQ
2013
2SELCABLE TRAY SUPPORTONGCSTRUCTURAL DESIGN, ANALYSIS & DETAILING  FOR CABLE TRAY SUPPORT
2013
3SELNEELAM & HEERA PLATFORMONGCBASIC ENGINEERING, OFFSITE PIPING,STRUCTURAL, ELECTRICAL & INSTRUMENTATION DESIGN DETAIING AND ANALYSIS
2013
4L&T3D MODELING, PIPING AND SUPPORTP&G3D MODELING,PIPING DETAILING, ROUTING, SUPPORT & STRESS ANALYSIS
2012
5SELEARTHING AND LIGHTING WORKONGCEARTH PIT CALCULATION, LAYOUT AND DRAWING
2013
6SOPAN O&MPIPING 3D MODEL, ISOMETIC, BOMHPCLPIPING 3D MODEL AND ISOMETRIC GENERATION AND BOM
2014
7SOPAN O&MPIPING 3D MODEL, ISOMETIC, BOMBPCLPIPING 3D MODEL AND ISOMETRIC GENERATION AND BOM
2014
8SOPAN O&MPIPING 3D MODEL, ISOMETIC, BOMHPCLPIPING 3D MODEL AND ISOMETRIC GENERATION AND BOM
9GAS PROCESSING FACILITIES, U.S. – RESOLUTE ENERGYPIPING DESIGN, FULL CIVIL DESIGN, ELECTRICAL & CONTROL DESIGN & CONSTRUCTION SUPPORTRESOLUTE ENERGYENGINEERING AND DRAFTING SERVICES FOR THE INSTALLATION OF AN 80 MMSCFD PROPANE REFRIGERATION PLANT AND A 60 MMSCFD DEHYDRATION UNIT AT AN EXISTING FACILITY. THE PROJECT DIRECTIVE IS TO UTILIZE DEHYDRATION, REFRIGERATION, AND EVENTUALLY A MEMBRANE PLANT TO CLEAN UP AND RECYCLE THE CO2, WHICH IS CURRENTLY BEING INJECTED INTO RESOLUTE ENERGY’S FIELDS FOR OIL RECOVERY.
2014
10THIRD PARTYDETAILED ENGINEERING AND DESIGN EQUIPMENTU.S. ENCANADETAILED ENGINEERING AND DESIGN EQUIPMENT: WATER TANKS, TRANSFER INJECTION PUMPS, POWER GENERATION, AND TRUCK LOADING AND UNLOADING.
2013
11THIRD PARTYDESIGN & DETAILINGIOCL PANIPATDESIGN & DETAILING OF ONE NOS. CIRCULAR & ONE NOS. RECTANGULAR FIRED HEATER-STRUCTURAL, DUCTING & PIPING.
2014
12THIRD PARTYDESIGN & DETAILINGRELIANCE PETROLEUM LTDDESIGN & DETAILING OF RELIEF KNOCKOUT DRUM, HYDROCARBON ABSORBER, VAPOR EXCHANGER, COMBINED VAPOR LIQUID CHILLER, REFRIGERANT ECONOMIZER.
2014

 

 

 

PROCESS PLANT ENGINEERING PROJECTS By ARSLAN ENGINERY PVT.LTD.YEAR
SR.NOCLIENTPROJECTEND CLIENTSCOPE OF WORK
1AKER SOLUTIONKRISHNAPATANAM VEGETABLE OIL REFINERYLD COMMODITIES INDIA PVT. LTD.PIPING LAYOUT,ISOMETRICS DRG., MTO,SUPPOET GA & DETAILS WITH SUPPORT MTO.2010
2KBK CHEM ENGG PVT LTD150 MTD ETHYL ACETATE PLANTGNFC BHARUCH3D MODELING, PIPING LAYOUT,ISOMETRICS DRG., MTO,SUPPOET GA & DETAILS WITH SUPPORT MTO, STRESS ANALYSIS2011
3XYTEL INDIAPILOT PLANT MODELTAKREERPIPING GA, 3D MODEL, BOM SUPPORT2009
4XYTEL INDIAPILOT PLANT MODELGHARDA CHEMICALSPIPING GA, 3D MODEL, BOM SUPPORT2009
5ULTRATECH CEMENTBAG FILTER PIPINGULTRATECH CEMENTPIPING LAYO UT, ISOMETRICS DRG., MTO,SUPPOET GA & DETAILS WITH SUPPORT MTO, STRESS ANALYSIS2012
6PRAJ INDUSTRIESBREWERY PLANTPIPING LAYO UT, ISOMETRICS DRG., MTO,SUPPOET GA & DETAILS WITH SUPPORT MTO2012
7PRAJ INDUSTRIESPROCESS PLANTRELIANCEPIPING 3D MODELING IN PRO-PIPE, 2D PIPING LAYOUT, PIPING ISOMETRICS WITH BOM, SUPPORT DWG, MTO2013
8PRAJ INDUSTRIESPROCESS PLANTBIOCON MALAYSIAPIPING 3D MODELING IN PRO-PIPE, 2D PIPING LAYOUT, PIPING ISOMETRICS WITH BOM, SUPPORT DWG, MTO2013 & 2015
9XYTEL INDIAHEAT EXCHANGER PILOT PLANT3D MODELING,PIPING LAYO UT, ISOMETRICS DRG., MTO,SUPPOET GA & DETAILS WITH SUPPORT MTO2014
10XYTEL INDIAPOLY PROPYLENE PILOT PLANT3D MODELING,PIPING LAYO UT, ISOMETRICS DRG., MTO,SUPPOET GA & DETAILS WITH SUPPORT MTO2014
11KBK CHEM ENGG PVT LTD60KLPD DISTILLERY PLANTPROVIDING ONSITE 2 ENGINEER-PIPING ISOMETRIC, SUPPORT DETAILING WORK, STRUCTURAL2014
12XYTEL INDIAPLASTIC PYROLYSISSABICSTRUCTURAL ANALYSIS, SKID DESIGN, MEMBER SIZING, CIVIL FOUNDATION,GA DRAWING, FABRICATION DRAWING2014
13SPX FLOW TECHNOLOGIES, INDIADAIRY DRYER PROJECTPLANT ENGINEERING WORK-3D MODELING,PIPING ISOMETRIC, SUPPORT DETAILING WORK, STRUCTURAL2014

 

 

 

 

 

Plant Design Engineering by Arslan Enginery Pvt.Ltd.
Sr. No.Client NameClient’s P.O.Reference & DateEnd ClientProject Description
 1.PLANTECH CONSULTANTS PVT.LTDPO/CTS/199-1002-10-2010LurgiISO generation from back up including required set up,customization & regeneration tor minor corrections.
2PLANTECH CONSULTANTS PVT.LTDPO/CTS/204-1025-11-2010ONGC1) Integration ot TEKLA to PDSFW,for three different models.2) To make Model intelligent so that it can be edited at any instant & do clash detection.3) Misc.support modelling for above structure.
3L & T Integrated Engineering Services,ChennaiLTIESPUR_10-11_1260-1 15-02-2011P&G USADesign Engg Services- SP3D1 )As built of all piping as per red line mark up for chemical and fibre plant2) Equipment Modeling, ISO generation, layout extraction3) Stress Analysis of rerouted lines
4L & T Integrated Engineering Services,Chennai.LTIESPUR_11-12_0280-110-05-2011P&G USAEngineering Consultancy Services1) Piping detailing and routing refering to P&ID2) Generating General Arrangement Drawings3) support customistion & placement of Pipe suppports
5L & T Integrated Engineering Services,Chennai.LTIESPUR_11-12_0621-114-06-2011P&G USAAs Builting of 250 field verified ISO for Goldrush project
6PLANTECH CONSULTANTS PVT.LTDPO/CTS/232-11 14-07-2011ONGC1) Integration of TEKLA to PDSFW,for three different models.2) To make Model intelligent so that it can be edited at any instant & do clash detection.3) Misc.support modelling for above structure.4) To update misc.changes in model(if req.)
7L & T -Chiyoda LimitedWO/2011-12/8828-07-2011Shah Gas Development (UAE)•Implimentation of SP3D•Piping specification customization which includes piping and instrument speciality (catalogue/symbols also) and nozzle data customization• Onsite support / trouble shooting to disciplines like Piping, Equipment, Instrument, Electrical, Civil & Structural• Piping support catalogue customization• Catalogue /specification customization for cable tray/raceway symbols• Symbols for Civil section libraries

• Isometric template / Orthogen template customization

• Report template customization

• Any other activity which is required for smooth implementation of SP3D

8L & T Integrated Engineering Services,Chennai.LTIESPUR_11-12_1139-225-08-2011P&G USAGoldrush Phase II Scope Document ( Engg of Following)1. Bleach Broke Area2. City Water Break Tank (27D-502) -3. Existing Plant Fresh Water Tank (27D-501)4. Boilers5. Wastewater Headers

6. Cooling Tower

7. Air Compressors

9PLANTECH CONSULTANTS PVT.LTDPO/CTS/236-11 08-09-2011ONGC1) Isomertic Extraction of 50(+/-3) lines from PDS.2) Import the FD fan Structure with Intelligency.
10Lahmeryer International (India) Pvt.Ltd.GEDE10135/ELEC/0112-09-2011Qurayyah CCPP Project (Saudi Electricity Company)SPEL work for support to all modules of SPEL including modeling Preparing master Schematic drawings, Cable scheduling reports, Cable tray Loading reports, Symbol Customisation.
11L & T Integrated Engineering Services,Chennai.LTIESPUR_11-12_1966-103-11-2011P&G USAGoldRush Phase II Extension Scope1. Resolutions of 100 Nos. To-Do-List errors in GoldRush-II2. Customization for 42 Nos. of To-Do-List errors.
12L & T Integrated Engineering Services,Chennai.LTIESPUR_11-12_1967-103-11-2011P&G USAGoldrush Phase II Extension Scope1. Copy 25 lines from BC1 to BC-32. Isometric extraction of 25 lines
13L & T Integrated Engineering Services,Chennai.LTIESPUR_11-12_1968-1 03-11-2011P&G USAGoldRush Phase II Extension Scope1. Report Customization.2. Engineering & Design of New Bleach Broke Lines.3. Engineering & Design of Condensate Flush Tank & Piping in Boiler Room.4.  Engineering & Design of Condensate Tank & Piping.5. Engineering & Design of Waste water Tank & Piping.

6. Deletion of Outside Area ( All Tanks, Piping & Structures).

7. All OGC Work of Phase-I.

14PLANTECH CONSULTANTS PVT.LTDPO/CTS/245-11 09-11-2011ONGCIsomertic Extraction of 26 (+/-3) lines from Backup.
15Prothious Engineering ServicesPESPL/MUM/2011-2012/23JGCDetail Enaineerina °f C°lumn. Heat Bc^natsf & Tank Column:-1) Mechanical Calculation2) General Arrangement drawing with Nozzle orientation.3) Fabrication details with BOM.Heat-Exchanger:-1) Mechanical Calculation

2) General Arrangement drawing with Nozzle orientation.

3) Fabrication details with BOM.

Drum:-

1) Mechanical Calculation

2) General Arrangement drawing with Nozzle orientation.

3) Fabrication details with BOM.

16Prothious Engineering ServicesPESPL/MUM/2011-2012/31JGCPiping Engineering services1) Preparation of Plot Plan2) Preparation of Equipment Layout.3) Preparetion of Piping Layout.4) Nozzle orientation details.
17Saipem India ProjectsContract No. 681197Shah Gas Development (UAE)INSOURCING OF SP3D DESIGNERS IN SIP OFFICE FOR SHAH GAS
PROJECTDesign the Lines of the Packages as per the input provided by the package vendors.- Design the small bore lines as per the guidelines.- Design of support’s based on CONTRACTOR Engineer’s guidelines.- Update the piping arrangement based on the comments from CONTRACTOR.- Update the equipment based on vendor information .

. To extract isometrics and update the comments during isometric extraction.

18PLANTECH CONSULTANTS PVT.LTDPO/CTS/254-1223-01-2012Cameroon Sonara3D MODELING FOR FM boiler in PDMS Boiler parameters: 120 TPH, 106 Barg, 5l0±5 “C, gas fired single drum, bottom supported boiler.SOW: Equipment Modeling and pressure part modeling as per client supplied drawings. Piping specification customisaction, Insrument and speciality symbol customisaion. Piping detailing and modeling refering P&IDs and 2 D Layouts. Import of structure from TEKLA and miscleneos structure modeling, extraction of various Plans and elevation of structure.Support modeling and placement refering to stress isometrics. support selection refering to standard provided by the client. Clash detection and resolution. Isometrics generation and extraction. Piping layout 2 D extraction, General Arrangement Drawing Extraction. Equipment Fabrication drawings. Various reports like nozzle report, line list, valve list, instrument list, Equipment list, each line MTO, bulk MTO. Cable tray routing and extraction of layout.
19PLANTECH CONSULTANTS PVT.LTDPO/CTS/253-1223-01-2012Gail Vijaypur (EIL)3D MODELING FOR HRSG Boiler in PDMS Boiler parameters: 120 TPH, 106 Barg, 5l0± 5 “C, gas fired single drum, bottom supported boiler.SOW: Same as Above Boiler
20PLANTECH CONSULTANTS PVT.LTDPO/CTS/252-1223-01-2012Gail Vijaypur (EIL)3D MODELING FOR RADIENT Boiler in PDMS Boiler parameters: 120 TPH, 106 Barg, 5l0±5 “C, gas fired single drum, bottom supported boiler.SOW: Same as Above Boiler
21L & T Integrated Engineering Services,Chennai.LTIESPUR_11-12_3073-224-02-2012P&G USAGoldRush-II All Plant Large Bore ISO Extractions
22Reliance Infrasructure LimitedSERI/ES3/2353269423-02-2012Reliance Infrasructure LimitedCreation of SPEL Report of “Typical POWER” and “Typical Control” by using SmartPlant Electrical
23Emerson Process Management India Pvt.Ltd.OW 5550204 13-02-2012Gail Vijaypur (EIL)Instrument Hook Up Design in PDMS.
24L & T Integrated Engineering Services,Vadodara.LTIESPUR_11-12_3263-112-03-2012Kiewit PowerCreation of P&ID(4 nos) using SPP&ID: Symbol Creation and databse customisaiton, Drafting P&IDs referring AutoCAD P&ID, Report extractions like Valve list, Equipment list, instrument lists, Line lists.
25GOLLA ENGINEERING PRIVATE LIMITEDGEPL/CTS/P0/2012/04/02-01Technip (IOCL Mathura Refinary Project)• Provision of three numbers of designers at respective job locations for minimum two month duration.• To update the 3D model (Piping only) as per Client comments.• To incorporate the new lines in the model.• To incorporate all comments by Golla.• To extract the Isometrics and GAD from the model.• To do the Pipe supporting in model as detailed by client.

• Updating the 3D model in PDS and extracting drawings.

26Lahmeryer International (India) Pvt.Ltd.LII/GEDE12008/WO/TAU2012-13/0039-04-2012Wadi, Sharourah, NagarnSP3D Designing work: Refering AutoCAD Layout Pipe routing and Designing, Equipment designing, Support Placement, ISO Extraction, GAD Extraction.
27Lahmeryer International (India) Pvt.Ltd.LII/GEDE11132/WO/TAL/2012-13/0029-04-2012Wadi, Sharourah, NagarnSP3D Designing work: Refering AutoCAD Layout Pipe routing and Designing, Equipment Designing, Support Placement, ISO Extraction, GAD Extraction.
28L & T Integrated Engineering Services,Vadodara.LTIESPUR_12-13_0255-101-05-2012Kiewit PowerCreation of P&ID(2 nos) using SPP&ID on ANSI-D(22″x 34″) Size 
29L & T Integrated Engineering Services,Vadodara.LTIESPUR_12-13_0299-108-05-2012Kiewit Power1) Setup and Administration of the Project using SP3D Version – V9 (SP1).2) Piping Specification Customization with SP3D Out of Box Symbols (4no.).3) Structure designing using SP3D default library.4) Equipment designing (18 nos).6) Piping designing.7) Isometric Drawing Border Template Customization with Default Package.

8) GAD Border Template Customization using default Graphic Rule.

9) Isometric and GAD Extraction.

10) Default Report extraction of Valve List and Line List.

30Emerson Process Management India Pvt.Ltd.OW 5550234 14-05-2012Gail Vijaypur (EIL)Instrument Hook Up Design in PDMS
31L & T Integrated Engineering Services,Chennai.LTIESPUR_12-13_0363-115-05-2012P&G USAPiping Spec customization in SP3D
32L & T Integrated Engineering Services,Chennai.LTIESPUR_12-13_0362-115-05-2012P&G USATo execute the SP3D portion of the WW Neutralization project, L&T will work in a new S3PD plant model, “GoldrushI_LT” (Project model). This model will only contain:The existing plant items that has to modify:1) Neutralization Tanks #1, #2, #3, and #42) Pipeline SUAE-510144A view-only Reference3D (R3D) model of the existing tank farm area, for coordination of new design with existing plant.
33Emerson Process Management India Pvt.Ltd.OW 5550265 30-Jun-12Gail Pata (EIL)Instrument Hook Up Design in PDMS.
34L & T Integrated Engineering Services,Vadodara.LTIESPUR_12-13_1069-115-05-2012Kiewit PowerPiping Stress Analysis of Pipelines within the SKID considering Wind, Seismic,Snow load as per provided data.Dynamic Analysis of PSV Lines.
35Emerson Process Management India Pvt.Ltd.OW 5550277 25-Jul-12Gail Pata (EIL)Instrument Hook Up Design in PDMS
36L & T Integrated Engineering Services,Chennai.LTIESPUR_12-13_1581-1 12-09-2012P&G USASP3D Additional Scope in Neutralization Project
37Reliance Corporate IT Park Ltd.XM9/31068785 11-10-2012RILPeligen forge Support Library Customisation as per Reliance standard support library (300 Supports)
38PLANTECH CONSULTANTS PVT.LTDPO/CTS/302-1209-10-2012Gail Vijaypur (EIL)3D MODEI ING FOR HRSG RoilerBoiler parameters: 120 TPH, 119 Barg, 5l0±5 “C, gas fired single drum, bottom supported boiler.SOW: same as Boiler scope mentioned above SR. No.18
39Triveni Engineering & Industries Ltd.Project No: PXD-972Triveni Engineering & Industries Ltd. (EIL)Engineering & Design of DM WATER PLANT AND CPU FOR GAIL PETROCHEMICAL COMPLEX-II By Using PDMS SOW: Structure modeling, Equipment Modeling, Spec customisation, Valve and instrument symbol customisation, Pipe routing refering P&ID, Supporting of lines, IFC ISO extraction, Layout extraction.
40PLANTECH CONSULTANTS PVT.LTDPO/CTS/324-1331-01-2013SABICSP3D MODEL ING FOR WHRRTail Gas Fired WHRBSOW: same as Boiler scope mentioned above SR. No.18
41Emerson Process Management India Pvt.Ltd.OW 84140905/139 21-02-2013Gail Pata (EIL)Instrument Hook Up Design in PDMS
42ATLAS COPCO(INDIA) LtdPR No 041 07-03-2013AT LA S CO P CO ( 1 ND I A) Ltd3D Modeling of skid, GAD, BOM, ISO Extraction
43PT ARIA PERSADA IndonesiaSO# 7432002265PT ARIA PERSADA Indonesia (Wilmar)HVAC Engineering & Design Consultancy Services for pressurized control room.
44MEIP DelhiMEIP-PIPING-2013-38MITSUBISHIDeputation of SP3D Administrator & ModelersOn going Project
45ATLAS COPCO(INDIA) Ltd75473ATLAS COPCO(INDIA) LtdDesign of pressure Vessel by using PV Elite
46Aquatech Systems (Asia) Pvt. Ltd.-42140026/1314Aquatech Systems (Asia) Pvt. Ltd.Pre-bid Engineering Service for Desalination Plant of California
47Transtech Projects Pvt LtdPO NO- 20SABICDeputation of SP3D Administrator & Modelers
48VA Tech Wabag LimitedMBG- PO-13565/10P27MdtReliance Industries LimitedProvide PDS Administration Services for their exiting project like Spec customization, ISO, GAD template customization, etc. Total Man hours consumed for this work is 400.
49VA Tech Wabag LimitedCHANDAN-TECH-SOLUTONS-MBG-PO-14181-PRICED-WOReliance Industries LimitedProvide PDS Modeling Services for their exiting project. Total Man hours consumed for this work is 1100.

 

 

50Transtech Projects Pvt LtdPO NO- 44SABICDeputation of SP3D Administrator & Modelers
51PT Wilmar Nabati IndonesiaSO# 8102157821PT Wilmar Nabati Indonesia (Wilmar)HVAC Engineering & Design Consultancy Services for four sites which is PFAD, FAL/Fatty Alcohol, BD-3 &4, BD-5.
52ATLAS COPCO(INDIA) Ltd75473ATLAS COPCO(INDIA) LtdDesign & ASME calculations of manifold by using PV Elite
53Aquatech Systems (Asia) Pvt. Ltd.AE-1035-42110624/1314RILPDS 3D Modeling Services for Reliance six units which was awarded to Aquatech. Total Man hours consumed for this work is 3500.
54Transtech Projects Pvt LtdPO NO- 52SABICDeputation of SP3D Administrator & Modelers
55Transtech Projects Pvt LtdPO NO- 62SABICDeputation of SP3D Administrator & Modelers
56Transtech Projects Pvt LtdPO NO- 74SABICDeputation of SP3D Administrator & ModelersOn going Project
57ISGEC Heavy Engineering Ltd106341/JE1502ISGECPDMS 3D Modeling Design Services for Auxilary Boiler:On going Project
SOW: Equipment Modeling and pressure part modeling as per client supplied drawings. Piping specification customisaction, Insrument and speciality symbol customisaion. Piping detailing and modeling refering P&IDs and 2 D Layouts. Import of structure from TEKLA and miscleneos structure modeling, extraction of various Plans and elevation of structure.Support modeling and placement refering to stress isometrics. support selection refering to standard provided by the client. Clash detection and resolution. Isometrics generation and extraction. Piping layout 2 D extraction, General Arrangement Drawing Extraction. Equipment Fabrication drawings. Various reports like nozzle report, line list, valve list, instrument list, Equipment list, each line MTO, bulk MTO. Cable tray routing and extraction of layout. Total Man hours considered for this work is 3700.
58Anewa Engineering Pvt LtdAEPL/ADM/2013-14/PO/88Technip (Abu Dhabi)Deputation of PDS Designer at Technip (Abu Dhabi) Location
59Ingenero Technologies India Pvt LtdING/CTS/26112013/00IngeneroLFM 3D Modeling Services
60Nipunn Engineering & Techno­Consultant Pvt LtdNETC/ACC/2014-15/0001/07.01.2014NipunnDeputation of PDMS Desigenr at Nipunn Gurgaon Office
61PLANTECH CONSULTANTS PVT.LTDPO/ENGG/CTS/145RILPDS 3D Modeling Services for Fuel Oil HeaterSOW: Equipment Modeling and pressure part modeling as per client supplied drawings. Piping specification customisaction, Insrument and speciality symbol customisaion. Piping detailing and modeling refering P&IDs and 2 D Layouts. Structure modeling, extraction of various Plans and elevation of structure.Support modeling and placement refering to stress isometrics. support selection refering to standard provided by the client. Clash detection and resolution. Isometrics generation and extraction. Piping layout 2 D extraction, General Arrangement Drawing Extraction. Equipment Fabrication drawings. Various reports like nozzle report, line list, valve list, instrument list, Equipment list, each line MTO, bulk MTO. Cable tray routing and extraction of layout. Total Man hours considered for this work is 750.On going Project
62PLANTECH CONSULTANTS PVT.LTDPO/ENGG/CTS/132RILPDS 3D Modeling Services for HRSG Boiler 275 TPHSOW: Equipment Modeling and pressure part modeling as per client supplied drawings. Piping specification customisaction, Insrument and speciality symbol customisaion. Piping detailing and modeling refering P&IDs and 2 D Layouts. Structure modeling, extraction of various Plans and elevation of structure.Support modeling and placement refering to stress isometrics. support selection refering to standard provided by the client. Clash detection and resolution. Isometrics generation and extraction. Piping layout 2 D extraction, General Arrangement Drawing Extraction. Equipment Fabrication drawings. Various reports like nozzle report, line list, valve list, instrument list, Equipment list, each line MTO, bulk MTO. Cable tray routing and extraction of layout. Total Man hours considered for this work is 1500.On going Project
63PLANTECH CONSULTANTS PVT.LTDPO/ENGG/CTS/141RILPDS 3D Modeling Services for Auxilary Boiler 2 X 250 TPHSOW: Equipment Modeling and pressure part modeling as per client supplied drawings. Piping specification customisaction, Insrument and speciality symbol customisaion. Piping detailing and modeling refering P&IDs and 2 D Layouts. Structure modeling, extraction of various Plans and elevation of structure.Support modeling and placement refering to stress isometrics. support selection refering to standard provided by the client. Clash detection and resolution. Isometrics generation and extraction. Piping layout 2 D extraction, General Arrangement Drawing Extraction. Equipment Fabrication drawings. Various reports like nozzle report, line list, valve list, instrument list, Equipment list, each line MTO, bulk MTO. Cable tray routing and extraction of layout. Total Man hours considered for this work is 1500.On going Project
64PLANTECH CONSULTANTS PVT.LTDPO/ENGG/CTS/133BPCLPDMS 3D Modeling Services for FGC (Flue Gas Cooler):SOW: Equipment Modeling and pressure part modeling as per client supplied drawings. Piping specification customisaction, Insrument and speciality symbol customisaion. Piping detailing and modeling refering P&IDs and 2 D Layouts. Structure modeling, extraction of various Plans and elevation of structure.Support modeling and placement refering to stress isometrics. support selection refering to standard provided by the client. Clash detection and resolution. Isometrics generation and extraction. Piping layout 2 D extraction, General Arrangement Drawing Extraction. Equipment Fabrication drawings. Various reports like nozzle report, line list, valve list, instrument list, Equipment list, each line MTO, bulk MTO. Cable tray routing and extraction of layout. Total Man hours considered for this work is 1100.On going Project
65PLANTECH CONSULTANTS PVT.LTDPO/ENGG/CTS/142BPCLPDMS 3D Modeling Services for HRSG Boiler 3 X 110 TPHSOW: Equipment Modeling and pressure part modeling as per client supplied drawings. Piping specification customisaction, Insrument and speciality symbol customisaion. Piping detailing and modeling refering P&IDs and 2 D Layouts. Structure modeling, extraction of various Plans and elevation of structure.Support modeling and placement refering to stress isometrics. support selection refering to standard provided by the client. Clash detection and resolution. Isometrics generation and extraction. Piping layout 2 D extraction, General Arrangement Drawing Extraction. Equipment Fabrication drawings. Various reports like nozzle report, line list, valve list, instrument list, Equipment list, each line MTO, bulk MTO. Cable tray routing and extraction of layout. Total Man hours considered for this work is 1800.On going Project
66Aquatech Systems (Asia) Pvt. Ltd.AE/1041/52110100/14-15RILPDS 3D Modeling Services for Reliance six units which was awarded to Aquatech. Total Man hours considered for this work is 4500.On going Project
67VA Tech Wabag LimitedIWG- PO-6125/10P56Reliance Industries LimitedProvide PDS 3D Modeling Services for Reliance J3 expansion DTA project. Total Man hours considered for this work is 6000.On going Project
68VA Tech Wabag LimitedIWG-PO-6120/10P54IReliance Industries LimitedProvide PDS 3D Modeling Services for Reliance J3 expansion SEZ TTP project. Total Man hours considered for this work is 3000.On going Project
69VA Tech Wabag LimitedIWG-PO-6121/10P55IReliance Industries LimitedProvide PDS 3D Modeling Services for Reliance J3 expansion SEZ ETP project. Total Man hours considered for this work is 2500.On going Project

 

 

70VA Tech Wabag LimitedMBG-PO-15188/10P27MReliance Industries LimitedProvide PDS 3D Modeling Services for their exiting RIL Dahej project. Total Man hours consumed for this work is 700.
71Tecton Engineering & Construction LLCTEC/CTEFE121210/WO/1002ZADCO Project No.P8362Provide Services related to Smart Plant 3D, Smart Plant P&ID, Smart Plant Instrumentation & Smart Plant Electircal for their ZADCO Project which is awarded to Tecton. Total Man hours considered for this work is 17600 for all Smart Plant Related Work.On going Project
72Tecton Engineering & Construction LLCTEC/CTEFE121210/WO/1003ZADCO Project No.P8362Deptation of Smart Plant 3D Admin, Smart Plant P&ID Admin, Smart Plant Instrumentation Admin and Smart Plant Electrical Admin at Tecton Abu Dhabi office for smooth execution of ZADCO Project.On going Project
73Osmoflo Engineering Services Pvt LtdOESPL/PO/14-15/0011Inventor 3D Modeling Austrilia ProjectDeptation of AutoCAD Inventor Designer At Osmoflo office for the period of 12 months.On going Project
74AVEVA IndiaAveva/Aug/14/001JSPLLaser Sacnning of Turbine Building and Intillegent 3D modeling for this TG building and cooling towers. Manhours estimated for this job are 1800On going Project
75AVEVA IndiaDamodar Valley CorporationCustomization of 400 templates for Power plant and Auxillaries. Manhours required for this Job are 2200On going Project
76Sandvik Asia Pvt LtdS-171021BPCLPDS 3D Modeling Services for IREP BPCL Kochi – Sulphur Forming & Handling System Integrated Refining Expansion Project. Total Man hours considered for this work is 2500.On going Project
Software Development
1Volkswagen India Private Limited8000014185Volkswagen India Private LimitedShimming Software for Pilot Hall
2Volkswagen India Private Limited8000015326Volkswagen India Private LimitedSupplier Chargeback Management
Training
1IBIC EngineeringIBIC/IT/ PO/35/2010-11 29-08-2010Toyo Thai (Thailand)Peligen Forge support Modeler(Thailand)
2IBIC EngineeringIBIC/IT/PO/41/2010-1103-09-2010Thai Wo Ree (Thailand)SP3DReference Data Engg. Services & Project set-up,PBS SET-UP Generation of Drawings-GA,ISOs MTO Generation Loading of Piping Specs as size dependent specs.
3Lahmeryer International (India) Pvt.Ltd.REF:LII/PUR/BMV/10-11/Training 02/11/2010Lahmeryer International (India) Pvt.Ltd.SP3D-Equipment & Piping Reference Data SP3D-Structural Reference Data SP3D-Drawing Customization SP3D- Electrical Reference Data
4Saipem India ProjectsSIP/HR/TRG/LOA-004/201104-01-2011Saipem India ProjectsSP3D-Piping & Equipment Modeling TSMP1001/Drawing Creation TSMP1006
5Saipem India ProjectsSIP/HR/TRG/LOA-005/201125-01-2011Saipem India ProjectsSP3D-Piping & Equipment Modeling TSMP1001/Drawing Creation TSMP1006
6Saipem India ProjectsSIP/HR/TRG/LOA-007/201102-02-2011Saipem India ProjectsSP3D-Smart Plant 3D electrical Modeling, Tray Support Modeling, Drawing Creation and Common Tasks
7Saipem India ProjectsSIP/HR/TRG/LOA-010/201101-03-2011Saipem India ProjectsSP3D-Piping & Equipment Modeling TSMP1001/Drawing Creation TSMP1006
8Saipem India ProjectsSIP/HR/TRG/LOA-011/2011 09-03-2011Saipem India ProjectsSP3D-Civil Modeling/ drawing Creation TSMP1006
9Saipem India ProjectsSIP/HR/TRG/LOA-013/201118-04-2011Saipem India ProjectsSP3D-Piping & Equipment Modeling TSMP1001/Drawing Creation TSMP1006
10Saipem India ProjectsSIP/HR/TRG/LOA-016/201120-04-2011Saipem India ProjectsSP3D-Civil Modeling
11Saipem India ProjectsSIP/HR/TRG/LOA-015/201125-04-2011Saipem India ProjectsSP3D-Electrical & Instrumentation Modeling
12Saipem India ProjectsSIP/HR/TRG/LOA-017/201112-05-2011Saipem India ProjectsSP3D-Piping & Equipment Modeling
13Saipem India ProjectsSIP/HR/TRG/LOA-025/201125-07-2011Saipem India ProjectsSP3D-Piping & Equipment Modeling TSMP1001/Drawing Creation TSMP1006
14Saipem India ProjectsSIP/HR/TRG/LOA-038/201128-11-2011Saipem India ProjectsSP3D-Piping & Equipment Modeling TSMP1001/Drawing Creation TSMP1006
15L & T -Chiyoda Limited064/2011-1223-06-2011L & T -Chiyoda LimitedTraining on1) SP3D piping & equipment modeling2) SP3D electrical modeling3) SP3D Structural Modeling4) SP3D drawing creation5) SP3D drawing Customization

6) SP3D Isometric Drawings

7) SP3D Report Customization

8)SP3D Set up & Administration

9) SP3D Equipment & Piping Reference Data

10) SP3D Electrical Reference Data

11) SP3D Structral Reference Data

16Linde Engineering India Pvt. Ltd.CTSPUMK/Linde/0101-08-2011Linde Engineering India Pvt. Ltd.SP3D Administration Training
17Linde Engineering India Pvt. Ltd.CTSPL/MK/Linde/02 07-09-2011Linde Engineering India Pvt. Ltd.SP3D Administration Training
18L & T Integrated Engineering Services,VadodaraLTIESPUR_11-12_3391-227-03-2012L & T Integrated Engineering Services,VadodaraSPEL user level Training
19National Petroleum Construction Company(NPCC)24821National Petroleum ConstructionCompany(NPCC Abu Dhabi)Smart Plant 3D Software Training (SP3D)
20Reliance Corporate IT Park Ltd.XM9/31068106 01-10-2012RILTraining & Impletation on SPP&ID & SPEL: Creating SPP&IDs, Drawing Manager. Support: Database creation and Project raising, Database Customistion, Report Customisation, Parametric Symbols, Insulation Spec Customisation.